Would anyone recommend installing a prv in a ceiling to replace the supply tank or install it below the hwc in the cupboard?

I am going to increase the hot pressure for a costumer soon and thought I might make the hot and cold equal to the new shower mixer (methven celeste), by installing a 3 in one valve with a 3.7m prv and then combine the two outlets that are on the supply tank (cold feed to shower and to hwc), lagged of course

she has a open vented wetback system, was also thinking I might increase the hight of the hwc exaust??? :-X


cheers.

Linkback: https://forum.plumbers.nz/ask-plumbers-trade/43/pressure-reducing-valve-location/1139/

integrated

i would throw it in with hwc - nothing worse than having to crawl through a ceiling space or under a floor to find and adjust a prv

gives better accessibility and better protection from freezing also 

roberto

yeah i see where ur coming from, i just want to avoid a unequal system,so I dont have to go back and put the jet back in the shower mixer that ive already taken out....


integrated

you can still do what you want to do depending on the existing plumbing



normally in my experience the high pressure feed to the ceiling tank and low pressure hwc feed went up/down through the hwc cupboard - if this is the case then:


- bridge the low pressure feed to the hwc and low presure feed to shower in the ceiling space
- use the old high pressure feeding ceiling tank that goes up inside hwc cupboard to supply 3in1 & prv to hwc inlet
- take a tee off after prv and connect to old low pressure feed to hwc which is now equal low pressure supply to shwr

should not have to touch hot supply unless installing temp valve then additional tee required (also after prv)

of course this all depends if pipework travels up/down hwc cupboard!!

Goodluck!!

o2b007

I would check how the wetback is feed, If it is a clossed loop it will also be feed off the header tank otherwise intergrated has it bang on.
oh and if there is no tempering valve you should talk them into putting one in just make sure that it suitable for the wetback.

roberto

hey, no its not a closed loop wetback, there are uncommon here.

qeplumbing@gmail.com

Keep in mind that the pressure from the prv to the cylinder will increase by about  2m head pressure once going through the prv dropping down to the cylinder.
Always a lot to keep in mind with maintenance on older systems hey mate!! :)
Best to put it in a location close as possible to the cylinder.